Real client work

The task, the changes and the verified result

No ranking promises. Each story shows the client task, the actual changes and the follow-up numbers.

eco-santeh.ru logo

01

eco-santeh.ru

25–29 July 2026

509 pages opened without errors

Fixed the shared templates and checked the final set of 509 pages. The initial and final crawls contained different URL sets.

Follow-up check

Pages opened without an error
Final check509/509
Technical readiness on the project scale
Before35After93

What we changed

Updated the shared page templates and removed repeated errors

  • Completed page titles, descriptions and main headings
  • Set the primary address for every page

Limitation

The first crawl covered 596 pages and the final crawl 509, so these were not the same URL set

засорсервис.рф logo

02

засорсервис.рф

July 2026

575 pages passed the follow-up check

Removed the first-screen shift and confirmed the final URL list.

Follow-up check

Pages opened without an error
Final check575/575
Technical readiness on the project scale
Before37After80

What we changed

Fixed the shared templates and removed the cause of the home-page shift

  • Completed the core data on repeated page templates
  • Added information that search engines can read

Limitation

Performance ranged from 53 to 72 and LCP from 2.74 to 3.79 seconds between laboratory runs

Site errors

0↓99.9%
images without fixed dimensions · zasorservice.rf
control25K15K5K0templatesimplementation25P1TemplatesImplementationReviewP4

P4: 25

Readiness37 → 80Pages575/575CLS0.519 → 0.0001Controlpassed
Errors ↓Verified ✓Stability ↑

Resolved0

Follow-up check